Home

News
   Latest News
   Guidelines

  
Passenger Information

   Timetable

   Ticketing
**Updated**
   System Map

   Engineering Work

General Information
   History
   Extensions
   Tramlink Shop
   Glossary/Signs
   Site Search / Archive

Infrastructure
   Detailed diagrams
   Electrification
   Tram Stops

   Next tram displays
   Therapia Lane Depot
   The Control Room
   Signalling
   Radio system

The Trams
   Introduction
   Delivery
   Onboard
   Cab controls
   Coupling Trams
   Destination Blinds
   Adverts
   Technical Specs
   CR-4000s

Pictures
   Photo Gallery
   Misplaced Vehicles
   HMRI tests
   Trams in the snow
   On Track Plant

Driver Eye Views
   Central Croydon
   New Addington
   Beckenham/
     Elmers End
   Wimbledon
   Through the depot

Special Reports
   Opening Special
   Opinions
   Royal Visit
   Review of 2000
   Tramlink Tours
   Ghost Stop: Centrale

   Tram naming

Links
   Official TfL Trams Site
   Related sites
   E-mail me!

   Disclaimer
   Privacy Statement

©1999-2007
S.J. Parascandolo

 


Photo Gallery - Therapia Lane Depot

 
Copyright for all pictures belongs to the credited photographer. If you wish to use images for anything other than for personal use, please contact the webmaster first.
 
Take the tram to:     Therapia Lane   
 
Gallery

2540 showing Line 5 - Crystal Palace destination blinds

By: A Driver

Date: 04/11/2006

ID: 1584

New TCL Maintenance Vehicle in Therapia Lane yard

By: TCL

Date: 02/11/2006

ID: 1583

New TCL Maintenance Vehicle in Therapia Lane yard

By: TCL

Date: 02/11/2006

ID: 1582

Damaged Workshop Door on 1E by runaway tram 2533

By: A Correspondent

Date: 27/08/2006

ID: 1575

Severe damage to 2538 after it was hit by 2533 in a Collision at New Addington

By: Michael Pead

Date: 24/06/2006

ID: 1576

Tamper lifts itself off the low loader at Therapia Lane

By: Tramlink

Date: 16/10/2005

ID: 1552

Tamper lowers itself onto the track at Therapia Lane Depot

By: Tramlink

Date: 16/10/2005

ID: 1551

Tamper arrives at Therapia Lane

By: Tramlink

Date: 16/10/2005

ID: 1550

SEG Addington Additive Tour of Workshop

By: S.J.Parascandolo

Date: 17/06/2001

ID: 1288

2537 - SEG Addington Additive Tour - Therapia Lane Yard Track 12

By: S.J.Parascandolo

Date: 17/06/2001

ID: 1278

2537 - SEG Addington Additive Tour - Boarding Therapia Lane Yard Track 12

By: S.J.Parascandolo

Date: 17/06/2001

ID: 1287

2537 - SEG Addington Additive Tour - Therapia Lane Yard Track 12

By: S.J.Parascandolo

Date: 17/06/2001

ID: 1277

2537 - SEG Addington Additive Tour - Therapia Lane Yard

By: S.J.Parascandolo

Date: 17/06/2001

ID: 1286

Cab View - Stabling Yard

By: S.J.Parascandolo

Date: 08/10/2000

ID: 188

2545 - The LRTA Tour - Depot East Apron

By: S.J.Parascandolo

Date: 08/10/2000

ID: 192

2545 - The LRTA Tour and 2532 - Depot East Apron

By: S.J.Parascandolo

Date: 08/10/2000

ID: 191

Cab View - Entering the Depot at the East Gate

By: S.J.Parascandolo

Date: 08/10/2000

ID: 190

Cab View - Stabling Yard

By: S.J.Parascandolo

Date: 08/10/2000

ID: 189

Cab View - Through the Tram Wash

By: S.J.Parascandolo

Date: 08/10/2000

ID: 187

Cab View - Tram Wash

By: S.J.Parascandolo

Date: 08/10/2000

ID: 186

Cab View - Depot Sanders

By: S.J.Parascandolo

Date: 08/10/2000

ID: 185

Cab View - Approaching the Sanders

By: S.J.Parascandolo

Date: 08/10/2000

ID: 184

Cab View - Stabling Yard

By: S.J.Parascandolo

Date: 08/10/2000

ID: 178

Cab View - Depot West Exit

By: S.J.Parascandolo

Date: 08/10/2000

ID: 182

Cab View - Heading west through the yard

By: S.J.Parascandolo

Date: 08/10/2000

ID: 179

Cab View - Taking the Wash Road

By: S.J.Parascandolo

Date: 08/10/2000

ID: 183

Cab View - Approaching the West Gate

By: S.J.Parascandolo

Date: 08/10/2000

ID: 180

Stripped down interior of 2532 awaiting parts after the Gravel Hill accident

By: S.J.Parascandolo

Date: 08/10/2000

ID: 217

Stripped down interior of 2532 awaiting parts after the Gravel Hill accident

By: S.J.Parascandolo

Date: 08/10/2000

ID: 215

Cab View - Depot West Gate

By: S.J.Parascandolo

Date: 08/10/2000

ID: 181

2530 on the back of a Low Loader (Date approximate)

By: Tramlink News

Date: 01/10/2000

ID: 169

2542 (Amey) and 2547 in the west end of the Workshop

By: S.J.Parascandolo

Date: 19/08/2000

ID: 193

The Sand Silo

By: S.J.Parascandolo

Date: 19/08/2000

ID: 216

Under a Tram in the Workshop pit

By: S.J.Parascandolo

Date: 19/08/2000

ID: 214

The Bombardier Office next to the Workshop

By: S.J.Parascandolo

Date: 19/08/2000

ID: 213

Cab View - Inside the Workshop (looking to Croydon)

By: S.J.Parascandolo

Date: 19/08/2000

ID: 212

2547 in the Workshop

By: S.J.Parascandolo

Date: 19/08/2000

ID: 211

Therapia Lane Stabling yard from the Workshop

By: S.J.Parascandolo

Date: 19/08/2000

ID: 210

Synchronized Jacks in the Workshop

By: S.J.Parascandolo

Date: 19/08/2000

ID: 209

Wheel Lathe in the Workshop

By: S.J.Parascandolo

Date: 19/08/2000

ID: 207

2542 with 'Not to be Moved' sign in the Workshop

By: S.J.Parascandolo

Date: 19/08/2000

ID: 194

Croydon Tramlink Egroup Depot Visit pose outside the Workshop

By: Our Guide

Date: 19/08/2000

ID: 168

First glance of First Group's Advert on 2550 at Therapia Lane Yard

By: S.J.Parascandolo

Date: 17/04/2000

ID: 195

First glance of First Group's Advert on 2550 at Therapia Lane Yard

By: S.J.Parascandolo

Date: 17/04/2000

ID: 196

Depot - West Side

By: S.J.Parascandolo

Date: 30/03/2000

ID: 201

Therapia Lane Stabling Yard

By: S.J.Parascandolo

Date: 30/03/2000

ID: 197

Depot - East Side

By: S.J.Parascandolo

Date: 30/03/2000

ID: 198

2541 in the Workshop

By: John Bradshaw

Date: 23/10/1999

ID: 170

2540 and 2537 - Workshop

By: John Bradshaw

Date: 23/10/1999

ID: 177

2540 and 2547 in the Workshop

By: John Bradshaw

Date: 23/10/1999

ID: 208

A Lowered Pantograph from the overhead gantries in the Workshop

By: A Helpful Tram Driver

Date: 26/07/1999

ID: 205

On the roof of a tram from the overhead gantries in the Workshop

By: A Helpful Tram Driver

Date: 26/07/1999

ID: 206

Therapia Lane Yard from above (Date approximate)

By: A Cement Plant Worker

Date: 01/03/1999

ID: 176

Therapia Lane Yard from above (Date approximate)

By: A Cement Plant Worker

Date: 01/03/1999

ID: 203

Therapia Lane Yard from above (Date approximate)

By: A Cement Plant Worker

Date: 01/03/1999

ID: 204

Therapia Lane Yard from above (Date approximate)

By: A Cement Plant Worker

Date: 01/03/1999

ID: 202

Tram and the east side of the depot

By: S.J.Parascandolo

Date: 16/02/1999

ID: 200

Sand Pump in the Wash Road (Date approximate)

By: Tramlink News

Date: 01/02/1999

ID: 171

Depot Wash Road under construction (Date approximate)

By: Tramlink News

Date: 01/02/1999

ID: 175

2530 at the Press Launch of the first tram delivered (Date approximate)

By: Mark Jansen

Date: 10/10/1998

ID: 174

2530 at the Press Launch of the first tram delivered (Date approximate)

By: Mark Jansen

Date: 10/10/1998

ID: 173

2530 at the Press Launch of the first tram delivered (Date approximate)

By: Mark Jansen

Date: 10/10/1998

ID: 172

03 and Ballast wagons at Therapia Lane in 1998

By: David Cockle

Date: 01/05/1998

ID: 199

 
Designed by Trapdoor Internet Services